Artificial intelligence: how big is the boom?

Investment, chips, data centres, electricity, usage and revenue: the public figures that measure the AI wave, from the spending to what it earns.

Citoyen·Data as of Nov 10, 2026

Scope: world, split into the United States, China, Europe and the rest of the world when the source publishes it.

Key points

Capex of the 4 cloud giants$202bnin Q3 2026, up 108% on a year earlier
Capacity of the large AI data centres tracked14 GWQ3 2026, against 4.6 GW a year earlier
Electricity used by data centres485 TWhin 2025, about 1.5% of world demand
Anthropic quarterly revenue$17bnQ3 2026, against $1.4bn a year earlier
  • Investment doubled in a year. Microsoft, Alphabet, Amazon and Meta spent $497bn on equipment in the first nine months of 2026, against $257bn a year earlier.
  • Construction is accelerating wherever it is measured. In the United States, data-centre construction runs at $96.5bn a year (September 2026, provisional), against $1.6bn in 2014. The large AI sites tracked by Epoch AI add up to 14 GW, and their projects announce 38.2 GW by end-2028.
  • The boom is American first. The United States takes 83% of private AI investment in 2025 and 86% of the capacity of the large AI sites tracked. China lags on money, but its developers now account for 56% of tokens on OpenRouter.
  • Usage prices collapse, volumes explode. The same level of performance costs 214 times less than in 2023, and Google’s APIs process 32bn tokens a minute, against 7bn a year earlier.
  • Revenue follows, from a distance. Over the last four reported quarters, the cloud giants invested $615bn; NVIDIA sold $278bn of data-centre hardware; Anthropic, one of the two leading labs, took in $35.3bn.
How to read these figures

There is no official worldwide statistic on AI. This analysis brings together three families of sources, flagged by a badge next to each figure: official sources (US Census Bureau, International Energy Agency), research organisations (Epoch AI, Stanford AI Index) and private sources: research firms (Synergy, BloombergNEF, JLL) and companies speaking about themselves (Alphabet, Anthropic, NVIDIA). Official sources carry no badge.

Company figures are quoted as the companies publish them, in their SEC filings or investor communications. When a company writes « over » or « nearly », the value is flagged as such. No figure seen only in the press is used.

Estimates by private firms do not all measure the same thing (world or North America, total or IT capacity, under construction or announced). They are shown side by side, with their scope, and never drawn on one axis.

1. How much is being invested

The boom shows first in the accounts of the four largest cloud operators. Their purchases of equipment (data centres, servers, chips) reached $202bn in Q3 2026, more than double a year earlier. In 2025 they had already spent $376bn.

Private investors follow the same slope: $345bn invested in AI companies in 2025, against $151bn in 2024, of which $171bn in generative AI. The United States takes $286bn, Europe $20.9bn, China $12.4bn.

Capital expenditure of the four cloud giants, by quarter

Purchases of property and equipment (cash-flow statement), US$ billions, calendar quarters. These amounts cover all investment, not only AI, but AI is what the companies say drives the increase.

  • Meta
  • Amazon
  • Alphabet
  • Microsoft

Source:SEC EDGAR: Microsoft, Alphabet, Amazon, MetaSource type : Private

Show the chart data
PeriodMicrosoftAlphabetAmazonMeta
Q1 2024$11.0bn$12.0bn$14.9bn$6.4bn
Q2 2024$13.9bn$13.2bn$17.6bn$8.2bn
Q3 2024$14.9bn$13.1bn$22.6bn$8.3bn
Q4 2024$15.8bn$14.3bn$27.8bn$14.4bn
Q1 2025$16.8bn$17.2bn$25.0bn$12.9bn
Q2 2025$17.1bn$22.5bn$32.2bn$16.5bn
Q3 2025$19.4bn$24.0bn$35.1bn$18.8bn
Q4 2025$29.9bn$27.9bn$39.5bn$21.4bn
Q1 2026$30.9bn$35.7bn$44.2bn$19bn
Q2 2026$35.8bn$44.9bn$54.2bn$30.1bn
Q3 2026$39.4bn$51.4bn$77.3bn$33.9bn

Private investment in AI companies, world

Funding rounds and capital transactions of AI companies (over $1.5M raised since 2013), US$ billions. One edition (2026) of the Stanford AI Index, so revisions are never mixed.

  • Generative AI
  • All AI

Source:Stanford HAI, AI Index 2026 (data: Quid)Source type : Research

Show the chart data
PeriodAll AIGenerative AI
2013$5.2bn–
2014$9.6bn–
2015$13.4bn–
2016$17.1bn–
2017$25.7bn–
2018$43.1bn–
2019$58.2bn$840M
2020$73.8bn$2.4bn
2021$145bn$5.3bn
2022$113bn$4.0bn
2023$104bn$28.6bn
2024$151bn$50.6bn
2025$345bn$171bn

Private investment in AI, by region

Same data, by region of the company’s headquarters. The Stanford AI Index publishes no total for the rest of the world; it is not recomputed here.

  • China
  • Europe
  • United States

Source:Stanford HAI, AI Index 2026 (data: Quid)Source type : Research

Show the chart data
PeriodUnited StatesEuropeChina
2013$3.6bn$660M$620M
2014$7.0bn$1.3bn$670M
2015$9.3bn$850M$2.1bn
2016$10.2bn$1.2bn$4.5bn
2017$14.1bn$2.6bn$6.6bn
2018$21.1bn$3bn$14.0bn
2019$32.1bn$6.3bn$14.1bn
2020$44.2bn$6.2bn$17.1bn
2021$86.9bn$14.7bn$25.9bn
2022$61.2bn$14.8bn$15.1bn
2023$72.4bn$12.1bn$9.5bn
2024$110bn$19.5bn$9.4bn
2025$286bn$20.9bn$12.4bn

2. Chips: the bottleneck

AI is measured in computing power. Epoch AI converts every chip sold into « H100 equivalents », NVIDIA’s reference chip. Since 2022, 31.6M H100 equivalents have been delivered, 6.3M of them in Q2 2026 alone (up 116% on a year earlier).

NVIDIA supplies 62%; in-house chips from Google (TPU), Amazon and AMD make up the rest. Chinese designers (Huawei, Cambricon) account for only 3% of deliveries, held back by US export controls. On the revenue side, NVIDIA’s data-centre business reached $89bn in Q2 2026.

Computing power delivered each quarter, by chip designer

Millions of H100 equivalents (Epoch AI median estimates, with an uncertainty range). « China » = Huawei and Cambricon. The last, incomplete quarter is not shown.

  • China
  • Amazon (Trainium)
  • AMD
  • Google (TPU)
  • NVIDIA

Source:Epoch AISource type : Research

Show the chart data
PeriodNVIDIAGoogle (TPU)AMDAmazon (Trainium)China
Q1 20240.573M0.122M0.055M0.033M0.045M
Q2 20240.684M0.141M0.119M0.043M0.045M
Q3 20240.835M0.183M0.169M0.076M0.046M
Q4 20241.2M0.283M0.205M0.148M0.050M
Q1 20251.7M0.441M0.16M0.138M0.137M
Q2 20251.9M0.63M0.105M0.161M0.14M
Q3 20252.4M0.801M0.202M0.187M0.14M
Q4 20253.0M0.875M0.218M0.22M0.14M
Q1 20263.4M0.923M0.23M0.226M0.215M
Q2 20264.0M1.6M0.261M0.288M0.217M

NVIDIA data-centre revenue

US$ billions per quarter (NVIDIA fiscal quarter matched to the nearest calendar quarter), as published in its 8-K filings.

Source:NVIDIA (SEC, 8-K)Source type : Private

Show the chart data
PeriodNVIDIA, data centre
Q4 2023$18.4bn
Q1 2024$22.6bn
Q2 2024$26.3bn
Q3 2024$30.8bn
Q4 2024$35.6bn
Q1 2025$39.1bn
Q2 2025$41.1bn
Q3 2025$51.2bn
Q4 2025$62.3bn
Q1 2026$75.2bn
Q2 2026$89.0bn

3. Data centres: where construction stands

Three measures complement each other. The number of large hyperscale data centres counted by Synergy rose from 1,136 at end-2024 to 1,360 at end-2025; they hold 48% of world capacity, and nearly 800 more are in the pipeline. Their capacity grew 36% in a year.

The installed power of the largest AI-dedicated sites, tracked one by one by Epoch AI, reaches 14 GW in Q3 2026, against 4.6 GW a year earlier; their projects announce 38.2 GW by end-2028. The United States hosts 86% of it.

Finally, the only official statistic: the US Census Bureau measures data-centre construction spending. It runs at $96.5bn a year in Sep. 2026, 12.2% of all private non-residential construction, against $1.6bn in early 2014. Building one MW now costs $10.7M per MW (excluding equipment), against $7.7M per MW in 2020 according to JLL.

IT power of the large AI data centres tracked by Epoch AI, by region

Gigawatts of IT power at quarter end. Beyond the last completed quarter: capacity announced by the projects, hatched, which may be delayed or cancelled. Epoch AI estimates it covers about 45% of world AI computing capacity, mostly in the US: this is not a world total.

  • Rest of the world
  • Europe
  • China
  • United States

Source:Epoch AISource type : Research

Show the chart data
PeriodUnited StatesChinaEuropeRest of the world
Q1 20240.47 GW0 GW0 GW0.060 GW
Q2 20240.87 GW0 GW0 GW0.060 GW
Q3 20241.3 GW0 GW0 GW0.060 GW
Q4 20241.8 GW0 GW0.040 GW0.16 GW
Q1 20252.4 GW0.12 GW0.040 GW0.16 GW
Q2 20253.4 GW0.16 GW0.040 GW0.33 GW
Q3 20253.9 GW0.28 GW0.17 GW0.33 GW
Q4 20255.7 GW0.50 GW0.17 GW0.35 GW
Q1 20266.9 GW0.59 GW0.20 GW0.70 GW
Q2 202610.4 GW0.63 GW0.24 GW0.89 GW
Q3 202612.1 GW0.72 GW0.24 GW1.0 GW
Q4 2026 (announced or projected)14.1 GW1.1 GW0.34 GW1.6 GW
Q1 2027 (announced or projected)16.4 GW1.1 GW0.34 GW1.6 GW
Q2 2027 (announced or projected)17.3 GW1.1 GW0.36 GW1.6 GW
Q3 2027 (announced or projected)18.5 GW1.7 GW0.56 GW1.6 GW
Q4 2027 (announced or projected)20.8 GW2.0 GW0.63 GW1.6 GW
Q1 2028 (announced or projected)25.2 GW2.1 GW0.63 GW2.4 GW
Q2 2028 (announced or projected)27.1 GW2.1 GW0.66 GW2.4 GW
Q3 2028 (announced or projected)27.9 GW2.1 GW0.66 GW2.5 GW
Q4 2028 (announced or projected)32.8 GW2.1 GW0.66 GW2.5 GW
Q1 2029 (announced or projected)33.0 GW2.1 GW0.66 GW2.5 GW
Q2 2029 (announced or projected)33.0 GW2.1 GW0.66 GW2.5 GW
Q3 2029 (announced or projected)33.0 GW2.1 GW0.66 GW2.5 GW
Q4 2029 (announced or projected)33.0 GW2.1 GW0.66 GW2.5 GW

United States: data-centre construction spending

Value of construction put in place, US$ billions at a seasonally adjusted annual rate (US Census Bureau). Buildings only: servers and chips excluded. The last three months are provisional.

Source:US Census Bureau

Show the chart data
PeriodData-centre construction
Jan. 2014$1.6bn
Feb. 2014$1.7bn
Mar. 2014$1.7bn
Apr. 2014$1.8bn
May 2014$1.8bn
Jun. 2014$1.8bn
Jul. 2014$1.8bn
Aug. 2014$2.0bn
Sep. 2014$1.9bn
Oct. 2014$1.8bn
Nov. 2014$2.0bn
Dec. 2014$1.7bn
Jan. 2015$1.9bn
Feb. 2015$1.9bn
Mar. 2015$2.1bn
Apr. 2015$2.3bn
May 2015$3.3bn
Jun. 2015$3.9bn
Jul. 2015$2.7bn
Aug. 2015$2.8bn
Sep. 2015$2.8bn
Oct. 2015$2.8bn
Nov. 2015$3.0bn
Dec. 2015$3.1bn
Jan. 2016$3.2bn
Feb. 2016$3.8bn
Mar. 2016$4.1bn
Apr. 2016$4.4bn
May 2016$4.2bn
Jun. 2016$4.6bn
Jul. 2016$4.3bn
Aug. 2016$4.6bn
Sep. 2016$4.2bn
Oct. 2016$3.7bn
Nov. 2016$4.0bn
Dec. 2016$4.5bn
Jan. 2017$4.0bn
Feb. 2017$4.2bn
Mar. 2017$4.0bn
Apr. 2017$4.2bn
May 2017$5.0bn
Jun. 2017$4.6bn
Jul. 2017$4.7bn
Aug. 2017$4.4bn
Sep. 2017$4.7bn
Oct. 2017$5.0bn
Nov. 2017$5.5bn
Dec. 2017$5.7bn
Jan. 2018$6.1bn
Feb. 2018$6.2bn
Mar. 2018$6.5bn
Apr. 2018$6.6bn
May 2018$7.0bn
Jun. 2018$7.1bn
Jul. 2018$7.5bn
Aug. 2018$7bn
Sep. 2018$6.3bn
Oct. 2018$7.9bn
Nov. 2018$7.1bn
Dec. 2018$8.1bn
Jan. 2019$8.1bn
Feb. 2019$8.0bn
Mar. 2019$7.6bn
Apr. 2019$7.9bn
May 2019$8.7bn
Jun. 2019$8.9bn
Jul. 2019$8.8bn
Aug. 2019$8.8bn
Sep. 2019$8.1bn
Oct. 2019$9.1bn
Nov. 2019$9.6bn
Dec. 2019$7.9bn
Jan. 2020$9.4bn
Feb. 2020$9.7bn
Mar. 2020$9.5bn
Apr. 2020$8.9bn
May 2020$8.7bn
Jun. 2020$9.0bn
Jul. 2020$8.8bn
Aug. 2020$9.1bn
Sep. 2020$10.1bn
Oct. 2020$9.3bn
Nov. 2020$9.2bn
Dec. 2020$9.2bn
Jan. 2021$9.3bn
Feb. 2021$9.1bn
Mar. 2021$10.3bn
Apr. 2021$9.4bn
May 2021$9.3bn
Jun. 2021$9.3bn
Jul. 2021$9.8bn
Aug. 2021$10.5bn
Sep. 2021$10.8bn
Oct. 2021$9.7bn
Nov. 2021$10.6bn
Dec. 2021$11.3bn
Jan. 2022$11.0bn
Feb. 2022$10.6bn
Mar. 2022$11.3bn
Apr. 2022$12.2bn
May 2022$12.1bn
Jun. 2022$12.2bn
Jul. 2022$12.8bn
Aug. 2022$13.1bn
Sep. 2022$14.6bn
Oct. 2022$12.8bn
Nov. 2022$13.9bn
Dec. 2022$14.2bn
Jan. 2023$15.6bn
Feb. 2023$17.9bn
Mar. 2023$18.0bn
Apr. 2023$17.9bn
May 2023$18.2bn
Jun. 2023$18.7bn
Jul. 2023$19.6bn
Aug. 2023$20.5bn
Sep. 2023$21.3bn
Oct. 2023$23.7bn
Nov. 2023$23.9bn
Dec. 2023$24.2bn
Jan. 2024$26.4bn
Feb. 2024$28.3bn
Mar. 2024$30.2bn
Apr. 2024$28.1bn
May 2024$32.3bn
Jun. 2024$35.3bn
Jul. 2024$36.1bn
Aug. 2024$36.7bn
Sep. 2024$37.6bn
Oct. 2024$40.1bn
Nov. 2024$41.0bn
Dec. 2024$44.7bn
Jan. 2025$45.3bn
Feb. 2025$46.4bn
Mar. 2025$46.6bn
Apr. 2025$52.8bn
May 2025$48.2bn
Jun. 2025$46.9bn
Jul. 2025$47.8bn
Aug. 2025$49.1bn
Sep. 2025$50.7bn
Oct. 2025$54.3bn
Nov. 2025$53.0bn
Dec. 2025$55.5bn
Jan. 2026$56.2bn
Feb. 2026$57.4bn
Mar. 2026$58.1bn
Apr. 2026$61.9bn
May 2026$65.7bn
Jun. 2026$72.7bn
Jul. 2026$80.7bn
Aug. 2026$88.8bn
Sep. 2026 (provisional)$96.5bn

Capacity under construction or announced: estimates that do not measure the same thing

Each firm has its own scope (world or North America, under construction or announced) and date. These figures do not add up and cannot be compared directly.

  • 23.1 GWWorld, IT capacity under construction, 831 sites, end-September 2025BloombergNEFSource type : Private· Mar. 24, 2026
  • 15.9 GWUnited States, same estimateBloombergNEFSource type : Private· Mar. 24, 2026
  • 2.9 GWEurope, Middle East and Africa, same estimateBloombergNEFSource type : Private· Mar. 24, 2026
  • 3.2 GWAsia-Pacific, same estimateBloombergNEFSource type : Private· Mar. 24, 2026
  • 66 GWNorth America, capacity under construction (95% pre-leased), mid-2026JLLSource type : Private· Aug. 11, 2026
  • 38.2 GWLarge AI sites tracked by Epoch AI: capacity announced for end-2028, construction and projectsEpoch AISource type : Research
  • 1,360large hyperscale data centres at end-20251,136 at end-2024

    Source:Synergy Research GroupSource type : Private

  • 67%of world capacity held by hyperscalers in 2031 (forecast)48% at end-2025

    Source:Synergy Research GroupSource type : Private

  • 17%of hyperscale capacity in Northern Virginia and around Beijing

    Source:Synergy Research GroupSource type : Private

  • 14%of Americans support a data centre in their communityJLL survey, August 2026

    Source:JLLSource type : Private

4. Electricity

According to the International Energy Agency, data centres used 485 TWh in 2025, slightly more than 1.5% of world electricity, after 415 TWh in 2024. The IEA expects a doubling by 2030, to 950 TWh (about 3% of world demand), driven by AI-focused data centres, whose consumption would triple.

The geography is highly concentrated: the United States accounts for about half of installed capacity worldwide and of announced additions. Four hyperscalers alone used 110 TWh in 2024. In Europe, the project pipeline is 2.3 times current capacity.

Electricity consumption of data centres, world

Terawatt-hours a year, all data centres (AI and other). 2024: rounded value (« around »); 2030: projection of the IEA Base Case, hatched.

Source:International Energy Agency (IEA)

Show the chart data
PeriodData centres
2024415 TWh
2025485 TWh
2030 (announced or projected)950 TWh
  • 465 TWhused by AI-focused data centres in 2030 (IEA projection)

    Source:International Energy Agency (IEA)

  • 110 TWhused by four hyperscalers in 2024

    Source:International Energy Agency (IEA)

  • ×2.3European Union: project pipeline relative to installed capacity

    Source:International Energy Agency (IEA)

5. Models: a US-China contest

Each year Epoch AI lists « notable » models (state-of-the-art results, wide adoption, historical significance). In 2025, 107 were released: 64 by US organisations, 35 by Chinese ones. Europe and the rest of the world share the remainder.

On usage, Chinese models, often open and cheap, have taken the lead on OpenRouter, a platform that routes developers’ requests to hundreds of models: DeepSeek, Z.ai and Tencent account for 56% of tokens in the week of Nov. 2, 2026, against 7.8% a year earlier. OpenRouter reflects neither companies’ use under their own contracts nor consumer apps.

Notable AI models released each year

Number of models by year of publication. A model developed by organisations of several countries counts for each: countries do not add up to the world total.

  • China
  • United States
  • World

Source:Epoch AISource type : Research

Show the chart data
PeriodWorldUnited StatesChina
201529194
201649366
2017552910
201837271
201968566
202050378
2021795421
2022916812
20231198623
2024985731
20251076435

Share of tokens processed on OpenRouter, by developer

Weekly share of tokens, %. Developer traffic through OpenRouter only. « Anonymous models »: models under test that OpenRouter does not attribute.

  • Others
  • Anonymous models
  • Tencent
  • Z.ai
  • DeepSeek
  • OpenAI
  • Anthropic

Source:OpenRouterSource type : Private

Show the chart data
PeriodAnthropicOpenAIDeepSeekZ.aiTencentAnonymous modelsOthers
Nov. 10, 202514.3%8.0%5.2%2.5%0%0%70%
Nov. 17, 202511.3%8.8%4.7%2.4%0%0%73%
Nov. 24, 202510.2%8.3%4.4%1.9%0%0%75%
Dec. 1, 202513.7%10.0%5.9%2.1%0%0%68%
Dec. 8, 202515.0%14.5%6.3%2.1%0%0%62%
Dec. 15, 202514.1%13.2%7.3%1.8%0%0%64%
Dec. 22, 202512.6%8.8%9.7%2.0%0%0%67%
Dec. 29, 202512.3%8.1%10.3%2.6%0%0%67%
Jan. 5, 202616.7%9.4%8.4%3.0%0%0%63%
Jan. 12, 202618.9%11.1%7.6%2.1%0%0%60%
Jan. 19, 202616.5%11.7%8.0%2.1%0%0%62%
Jan. 26, 202616.4%13.1%8.8%2.7%0%0%59%
Feb. 2, 202614.7%11.3%8.6%2.5%0%0%63%
Feb. 9, 202612.2%10.2%7.1%6.7%0%0%64%
Feb. 16, 202613.2%9.4%6.5%7.4%0%0%64%
Feb. 23, 202615.8%9.5%7.0%5.4%0%0%62%
Mar. 2, 202615.6%12.3%6.6%3.1%0%0%62%
Mar. 9, 202615.0%10.9%6.9%2.8%0%0%64%
Mar. 16, 202613.7%8.2%6.3%7.0%0%0%65%
Mar. 23, 202612.4%8.3%6.1%6.3%0%0%67%
Mar. 30, 20269.9%6.3%5.0%4.3%0%0%74%
Apr. 6, 202613.9%10.3%6.6%6.1%0%0%63%
Apr. 13, 202617%10.1%6.7%6.7%0%0%60%
Apr. 20, 202616.9%9.2%6.9%4.5%1.5%0%61%
Apr. 27, 202613.6%8.2%8.5%3.5%12.7%0%54%
May 4, 202614%7.7%10.9%3.2%13.7%0%50%
May 11, 202615.0%7.6%15.2%3.0%9.9%0%49%
May 18, 202616.1%8.4%19.1%2.7%10.6%0%43%
May 25, 202617.1%7.5%17.0%2.7%9.5%0%46%
Jun. 1, 202614.2%6.3%18.1%1.9%8.1%0%51%
Jun. 8, 202615%5.5%16.9%1.7%9.3%0%52%
Jun. 15, 202613.8%6.8%18.1%5.3%7.8%0%48%
Jun. 22, 202613.6%6.5%15.9%5.5%7.2%0%51%
Jun. 29, 202614.9%6.6%17.4%6.3%6.7%0%48%
Jul. 6, 202613.4%5.7%16.0%6.9%12.4%0%46%
Jul. 13, 202611.4%5.8%13.5%6.3%18.4%0%45%
Jul. 20, 20268.7%5.5%17.1%6.0%9.8%0%53%
Jul. 27, 20267.7%8.2%22%5.3%8.5%0%49%
Aug. 3, 20266.7%11.1%26%5.1%11.7%0%40%
Aug. 10, 20268.3%11.7%26%5.8%13.2%0%35%
Aug. 17, 20264.9%9.5%22%4.2%8.8%12.4%38%
Aug. 24, 20263.9%10.4%18.6%9.3%8.6%13.9%35%
Aug. 31, 20264.5%14.6%18.0%15.4%16.2%0%31%
Sep. 7, 20263.4%17.4%19.0%12.7%16.3%0%31%
Sep. 14, 20263.1%11.7%25%14.5%13.4%0.8%31%
Sep. 21, 20263%11.1%22%14.2%8.4%9.5%31%
Sep. 28, 20263.3%10.0%22%8.5%5.2%23%28%
Oct. 5, 20266.0%8.5%30%10.2%6.3%2.4%37%
Oct. 12, 20267.4%7.2%28%11.2%6.5%0%40%
Oct. 19, 20267.8%7.8%32%10.2%6.4%0%36%
Oct. 26, 20266.6%10.2%37%10.4%6.3%0%30%
Nov. 2, 20265.9%7.7%38%8.5%9.0%2.0%28%

6. The cost of tokens

The price of a given level of performance is collapsing. Reaching GPT-4’s level on PhD-level science questions cost $37.5 per million tokens in March 2023 (GPT-4); $0.175 in February 2025 with Gemini 2.0 Flash, 214 times less.

According to Epoch AI, this price falls about 40-fold a year, and 9- to 900-fold depending on the task (median: 50-fold, 200-fold for declines measured since 2024). But each task uses more and more tokens (reasoning, agents): the total bill rises, hence the investment of section 1.

Price of the cheapest model reaching GPT-4’s level (GPQA science questions)

US dollars per million tokens (3:1 blend of input and output tokens), logarithmic scale. Epoch AI stopped this series in February 2025.

Source:Epoch AISource type : Research

Show the chart data
PeriodPrice per million tokens
Mar. 2023 · GPT-4-0314$37.5
Nov. 2023 · GPT-4 Turbo$15
May 2024 · Gemini-1.5-Pro-2024-05$2.2
Feb. 2025 · Gemini 2.0 Flash$0.175
  • ÷40 a yearyearly price decline for GPT-4’s level (PhD-level questions)

    Source:Epoch AISource type : Research

  • ÷50 a yearmedian yearly decline, all tasks (9- to 900-fold)

    Source:Epoch AISource type : Research

  • ÷200 a yearmedian yearly decline measured since 2024

    Source:Epoch AISource type : Research

7. Usage

There is no worldwide meter of AI use; companies publish their own indicators. Google’s models process 32bn tokens a minute through their APIs in Q3 2026, against 7bn a year earlier. The Gemini app claims 1bn users, against over 650M monthly users a year earlier.

Official statistics show slower diffusion across the economy: in the United States, 24% of businesses reported using AI in the previous two weeks (Census Bureau BTOS survey, period ending Oct. 18, 2026).

Tokens processed per minute by Google’s model APIs

Billions of tokens a minute, direct API use by customers (excluding the Gemini app and Search), as stated by Alphabet each quarter. « Over », « approximately » and « nearly » kept from the statement.

Source:AlphabetSource type : Private

Show the chart data
PeriodTokens per minute
Q3 20257bn
Q4 2025over 10bn
Q1 2026over 16bn
Q2 2026about 22bn
Q3 2026nearly 32bn

United States: share of businesses using AI

Employer businesses that used AI in at least one function in the previous two weeks, %, Census Bureau biweekly survey (question wording in force since November 2025).

Source:US Census Bureau

Show the chart data
PeriodBusinesses using AI
Nov. 16, 202517.3%
Nov. 30, 202517.2%
Dec. 14, 202517.8%
Dec. 28, 202517.7%
Jan. 11, 202618.2%
Jan. 25, 202618.9%
Feb. 8, 202617.5%
Feb. 22, 202618.2%
Mar. 8, 202618.9%
Mar. 22, 202619.1%
Apr. 5, 202619.8%
Apr. 19, 202619.8%
May 3, 202619.5%
May 17, 202621%
May 31, 202621%
Jun. 14, 202621%
Jun. 28, 202622%
Jul. 12, 202622%
Jul. 26, 202622%
Aug. 9, 202622%
Aug. 23, 202623%
Sep. 6, 202624%
Sep. 20, 202624%
Oct. 4, 202625%
Oct. 18, 202624%

8. Revenue: who is making money?

For now, AI money goes first to infrastructure suppliers. NVIDIA sold $278bn of data-centre hardware over four quarters. The clouds follow: Google Cloud revenue grew 103% year on year in Q3 2026.

Model labs are only starting to publish accounts. Anthropic’s IPO prospectus, filed with the SEC, shows revenue rising from $41M in 2023 to $4.6bn in 2025, then $17bn in Q3 2026 alone. Its compute and infrastructure expenses reached $9.9bn that quarter. OpenAI publishes no accounts: its revenue figures could not be checked against a primary source.

Anthropic: revenue and compute costs, by quarter

US$ billions. Revenue and « compute and infrastructure » expenses from the quarterly (unaudited) table of the S-1 prospectus; the annual figures of the same document are audited.

  • Compute and infrastructure
  • Revenue

Source:Anthropic, PBCSource type : Private

Show the chart data
PeriodRevenueCompute and infrastructure
Q1 2025$380M$940M
Q2 2025$790M$1.4bn
Q3 2025$1.4bn$2.1bn
Q4 2025$2.0bn$2.9bn
Q1 2026$4.7bn$3.4bn
Q2 2026$11.6bn$5.6bn
Q3 2026$17.0bn$9.9bn

What is spent, what is earned: last four reported quarters

US$ billions summed over the last four quarters reported by each company (periods shown, one quarter earlier for NVIDIA). Cloud capex also serves other businesses; part of NVIDIA’s revenue is that same capex. Orders of magnitude, not a sector balance sheet.

  • Capex of the 4 cloud giantsQ4 2025 – Q3 2026$615bn
  • NVIDIA data-centre salesQ3 2025 – Q2 2026$278bn
  • Anthropic revenueQ4 2025 – Q3 2026$35.3bn

Source:Anthropic, PBCSource type : Private·SEC EDGAR: Microsoft, Alphabet, Amazon, MetaSource type : Private·NVIDIA (SEC, 8-K)Source type : Private

What we know, what we don’t

What the figures establish

  • Physical investment (data centres, chips) more than doubled in a year and is concentrated in the United States.
  • The cost of a given level of performance falls tens of times a year, while volumes processed soar.
  • Lab revenue is growing very fast but remains an order of magnitude below infrastructure spending.

What they cannot tell yet

  • The world total of capacity under construction: estimates range from one to three times each other depending on scope.
  • How many announced projects will be delivered on time: grid connections, turbines and local acceptance are the bottlenecks cited by the IEA and JLL.
  • The sector’s profitability: only some players publish accounts, and AI revenue is not reported separately within the clouds’ figures.

Sources

Cited values re-read on the publisher’s page on Nov 10, 2026. Open datasets downloaded on the snapshot date.

  • International Energy Agency (IEA) Key Questions on Energy and AI (World Energy Outlook Special Report), April 2026, Apr. 2026. CC BY 4.0
  • US Census Bureau Value of Construction Put in Place, private, seasonally adjusted annual rate: data center. US Government work (public domain)
  • US Census Bureau Business Trends and Outlook Survey (BTOS), national estimates. US Government work (public domain)
  • Epoch AI Source type : Research AI chip sales (quarterly deliveries by chip designer, median estimates, H100-equivalents). CC BY 4.0
  • Epoch AI Source type : Research Frontier data centers (IT power by site, realized and planned). CC BY 4.0Large AI data centres tracked by Epoch AI; about 45% of global AI computing capacity per Epoch.
  • Epoch AI Source type : Research Data on Notable AI Models (count by year of publication). CC BY 4.0
  • Epoch AI Source type : Research LLM inference prices have fallen rapidly but unequally across tasks. CC BY 4.0Price (US$ per million tokens, 3:1 input/output blend) of the cheapest model scoring at least GPT-4 (March 2023) level on MMLU ([86.0, 100]). Last model in the file released 2025-02-05: series no longer updated.
  • Stanford HAI, AI Index 2026 (data: Quid) Source type : Research Private investment in AI, world, generative AI and by region (fig. 4.2.2, 4.2.3, 4.2.11). CC BY-ND 4.0 (values as published)
  • Alphabet Source type : Private Q1 2026 earnings call: remarks from our CEO, Apr. 30, 2026
  • Alphabet Source type : Private Q2 2026 earnings call: remarks from our CEO, Jul. 22, 2026
  • Alphabet Source type : Private Q3 2025 earnings call: remarks from our CEO, Oct. 29, 2025
  • Alphabet Source type : Private Q3 2026 earnings call: remarks from our CEO, Oct. 28, 2026
  • Alphabet Source type : Private Q4 2025 earnings call: remarks from our CEO, Feb. 4, 2026
  • Anthropic, PBC Source type : Private Form S-1/A registration statement (amendment no. 2), filed with the SEC, Nov. 10, 2026Annual figures audited; quarterly figures unaudited (as stated in the filing).
  • BloombergNEF Source type : Private AI Data Center Build Advances at Full Speed: Five Things to Know, Mar. 24, 2026
  • JLL Source type : Private 2026 Global Data Center Outlook
  • JLL Source type : Private Data center demand exceeds expectations as H1 2026 absorption hits record 25 GW, Aug. 11, 2026
  • NVIDIA (SEC, 8-K) Source type : Private CFO commentary: revenue of the Data Center market platform
  • OpenRouter Source type : Private Share of tokens by model author (weekly). CC BY 4.0Share of tokens processed through OpenRouter, by model author, weekly. Top 50 public models per day plus OpenRouter's 'other' row. Developer traffic routed through OpenRouter only, not enterprise deployments nor first-party apps.
  • SEC EDGAR: Microsoft, Alphabet, Amazon, Meta Source type : Private Purchases of property and equipment (cash flow statement), per calendar quarterCash purchases of property and equipment, calendar quarters, US$ billions. Excludes assets acquired under finance leases (material for Meta, Microsoft and Amazon), so it differs from the 'capex incl. finance leases' headline some companies quote. Microsoft's fiscal year starts in July; quarters are mapped to calendar quarters.
  • Synergy Research Group Source type : Private Hyperscale Data Center Count Hits 1,136; Average Size Increases; US Accounts for 54% of Total Capacity, Mar. 19, 2025
  • Synergy Research Group Source type : Private Hyperscale Operators to Account for 67% of all Data Center Capacity by 2031, Apr. 7, 2026
  • Synergy Research Group Source type : Private US Rises Again as Synergy Updates Its Ranking of Hyperscale Data Center Locations, Aug. 19, 2026